• Call Us :+86 13663796880
  • Email :nicole@sfrooftile.com
  • Working hours :24 hours a day
  • Language :Chinese
open menu
News
Contact Us
Manager:

Nicole Zhang

Mobile:

+86 13663796880

Tel/Fax:

+86-379-63262958

Email:

nicole@sfrooftile.com

Construction Process of Glazed Tiles

Glazed tiles construction has a very long history of development in China. Its existence and development bring huge business opportunities to China's tourism industry. What is the construction process and conventional construction method of roof glazed tiles? What tools are needed for its construction? Here is a detailed description of the construction process of the roof glazed tiles in the construction of antique buildings.

​​​​​​ 

In recent years, with the development of China's economy, the types of buildings have also become more diversified. Among them, glazed tile roof construction has been widely adopted by modern buildings due to its many excellent functions. This kind of building has the characteristics of simplicity, generosity and various specifications, and it has been popularized in modern buildings. As a traditional construction technology, it has a long history. Its integration with modern construction technology makes the construction method of glazed tile slopes of ancient buildings merge with modern construction technology. The construction technology of good or bad engineering quality is the key. In practice, comprehensive consideration should be given to multiple parties, such as design, construction, supervision, etc., and each step must be strictly required. This article will explain the construction method and process of the glazed tile roof of ancient buildings.

1. Preparation of materials

Preparation of material is the premise to ensure the smooth construction, and the preparation of the tiles should be done carefully. The tiles are picked and picked by a special person to count the treasure roof, drip tile etc.

2. Technical preparation

First of all, we should improve the detail node design, have a high degree of familiarity with the design and construction drawings, and put forward the roof tile scheme. To collect and sort out the construction lofting and data, prepare a detailed construction technical scheme, carefully do a good job before the construction of drawings familiar with the construction lofting and other work. Resolve the problems in time and record the relevant data in a timely manner.

3. Preparation of construction equipment

The main mechanical equipments are mast cranes and level gauges and so on. The main tools are cotton yarn, thread rope, ash bucket, cable, foot pedal, aluminum alloy gauge, steel tap and so on. Carry out all-round inspections on these construction appliances, use and equip them with related spare appliances to prevent accidents.

CONTACT US